The auto, EV & electronics belt

Sriperumbudur and Oragadam are Tamil Nadu's manufacturing engine: OEM assembly, EV, electronics and logistics on the NH-48 Bengaluru spine, served by the SIPCOT park network. We site the operation and verify the land.

Why the Sriperumbudur belt

One of India's strongest auto and electronics clusters, on the Bengaluru highway. Indicative third-party context, for orientation, not a quote.

Figures are indicative third-party estimates and vary by park, zoning, frontage, power and period. The belt spans SIPCOT parks at Sriperumbudur, Oragadam, Irungattukottai, Pillaipakkam and the Vallam Vadagal aerospace park, anchoring auto OEM, EV, electronics and component manufacturing with strong NH-48 and port connectivity.

Four clusters, one corridor

A great belt is not a clean parcel

The corridor reputation is the easy part. Whether a specific parcel is converted, contiguous, powered and clean on title is what protects a multi-decade plant. We verify the land, not the location's name.

Indicative land & rent in Sriperumbudur & Oragadam

TypeUnitRange
SIPCOT OragadamPlot / acreRs 1.8 - 2.5 Cr
SIPCOT SriperumbudurPlot / acreRs 1.5 - 2.2 Cr
Grade-A manufacturing shedRent / sq.ft / moRs 24 - 34

The belt is India's leading auto and electronics cluster; SIPCOT allotment terms and private-land conversion both need close checking before purchase.

How Sriperumbudur & Oragadam connects

Infrastructure shaping Sriperumbudur & Oragadam

Frequently asked questions

Why is the Sriperumbudur belt strong for manufacturing?

It is among India's largest automobile and electronics clusters, with established OEM assembly at Oragadam, electronics and components at Sriperumbudur, the SIPCOT park network and NH-48 connectivity to Bengaluru and the ports.

Do you handle SIPCOT and private land here?

Yes. We advise on SIPCOT-allotted plots with their allotment and usage conditions, and on private industrial land, where conversion, classification and assembly need closer verification before purchase.

What do you verify before an industrial purchase?

Title and any multi-parcel assembly, agricultural conversion and classification, HT power, water and effluent feasibility, road and port access, and the SIPCOT or DTCP and environmental approval pathway, all at source.

What land sizes are available?

Parcels range from small supplier plots of an acre or two near the OEMs to large contiguous holdings of 50 acres or more for assembly and logistics, with indicative rates that vary widely by park and frontage.

Related

Find industrial land | Contact us